Project kind
Client Johnson Diversey
Location Enschede

The project

The complete hardware engineering relating to the control panels, the ASI field bus, the Profibus DP&PA field bus, linked to a Siemens S7- 400 configuration, with ProLeit as the predominant visualisation system. In addition to the aforementioned works, Moekotte also provided for the assembly and field installation of the control panels.

The assignment

The turn-key delivery of the Jupiter 2 production plant, including the electrical engineering, assembly and implementation of the complete E&I system.

The result

A brand new, high tech production site was realised within an extremely short construction time of just 5 months.