Project kind | |
---|---|
Client | Johnson Diversey |
Location | Enschede |
The complete hardware engineering relating to the control panels, the ASI field bus, the Profibus DP&PA field bus, linked to a Siemens S7- 400 configuration, with ProLeit as the predominant visualisation system. In addition to the aforementioned works, Moekotte also provided for the assembly and field installation of the control panels.
The turn-key delivery of the Jupiter 2 production plant, including the electrical engineering, assembly and implementation of the complete E&I system.
A brand new, high tech production site was realised within an extremely short construction time of just 5 months.