Project kind | Utility |
---|---|
Client | Ziekenhuis Zevenaar |
Location | Zevenaar |
The Regional Healthcare Centre new-build consisted of 3 floors. The RGC building was to be linked with the existing hospital. The advisor for the system was engineering firm Linsen, based in Amsterdam.
Moekotte implemented this project based on a well thought-out plan of action. According to the specifications, the works comprised the supply, installation, connection and “ready-for-use” delivery of the entire electrical system and to connect the new fire alarm system that was to be installed to the hospital’s existing system.
The result was creditable. Moekotte delivered the system to complete satisfaction. Furthermore, Moekotte provided a one-off training session for the user in relation to each of the systems to be supplied.