Project kind | |
---|---|
Client | Twence Afvalverwerking |
Location | Hengelo |
Moekotte charted the existing configuration of the five weigh bridges and designed a new control system concept that satisfied the requirements imposed by Twence. This control system concept was laid down in a functional design document, along with a budget estimation and inclusive of a presentation to the Twence management team.
The current control for the existing weigh bridges does not satisfy the current requirements, does not allow for an increase in capacity and the system configuration is too complex. The task comprised drawing up an inventory of the five existing weigh bridges with the ultimate objective of establishing a simplified configuration.
The presentation will soon be revealed to the management of Twence, so that the budget for the work can be requested.