Verzuimreductie

Moekotte installed all of the data cabling, plus the corresponding patch panel. Furthermore, the works comprised the installation of an audio and video system, the latter of which comprised several screens, and the adaptation of the existing

IBT Borne

Following a public tender, the construction contract was awarded to Aannemingsbedrijf Droste, based in Hengelo. The firms GTI Utiliteit and electrical engineering firm Moekotte were responsible for the technical installations. The total costs for the

Housing Corporation ‘de Woonplaats’

The advanced building security control system centred on a multifaceted control station. Moekotte designed this with two objectives in mind, namely the production of a bespoke system that offered a broad range of functions: • Management of the

Waste processing - Twence

The current control for the existing weigh bridges does not satisfy the current requirements, does not allow for an increase in capacity and the system configuration is too complex. The task comprised drawing up an inventory of the five existing

Chemicals - Johnson Diversey

Medical Spectrum Twente

Moekotte has implemented this project on the basis of a well thought-out Plan of Action. The works had to be carried out within a short period of time and amidst the day-to-day activities of the hospital. This is an aspect that Moekotte knew

Zevenaar Hospital

Moekotte implemented this project based on a well thought-out plan of action. According to the specifications, the works comprised the supply, installation, connection and “ready-for-use” delivery of the entire electrical system and to connect the

Food and Beverage - Grolsch

During the construction of the new Grolsch complex, Moekotte was contracted for all building-related systems, the lighting system, wiring for the lights and power supply, installation of the fire alarm system, construction of the telephone and data